Background
Due to the rapid increase in the population of the Governorates of Ajloun
and Kufranja, it has become necessary to expand the existing wastewater
treatment plants Kufranja wastewater treatment plant (WWTP) services areas
are located about 30 Km South of Irbid and 87 Km north of Amman. The
treatment plant facilities presently serve a population of approximately
31000cap. The treatment plant of Kufranja was constructed and placed in
operation in 19990,it consists of:
1. Preliminary treatment (mechanical bar screen which is usually on duty,
1. Manually–cleaned bar screen which is used as stand-by and par shall
flume.
2. Primary treatment.
3. Secondary treatment tickling filter.
4. Tertiary treatment maturation pond.
Objectives
The project objectives are to expand and upgrade the existing Wastewater
Treatment Plants and to increase the efficiency of wastewater treatment to
serve the needs of the connected areas.
Project Description
The project components are as follows:
• Treatment Plants
• Collection systems
• Pumping stations
• Reuse Program
Project Status
Financing of the JD12.0 million during the investment program period is
under negotiation.
Estimated Cost
The total estimated cost is JD12.0 million |