Background
The project consist of 12 siphons extending from North Shunneh in a
distance of 102 Km. the maximum flow discharge is 20 cubic meter/second in
the worth and the lowest flow discharge is 2.3 cubic meter/second.
It is required in the upgrading to increase the flow to 25 cubic
meter/second in the worth and 7 cubic meter/second in the south.
Objectives
The objective is to upgrade 11 siphons and construct one flume from north
shunneh to south shunneh in a distance of 102 Km with flow discharge
varies from 25 cubic meter/second to 7 cubic meter/ second .tow of the
siphons will be removed and open the trapezoidal canal will be consulted
instead. There are 2 bridges for these 2 siphons. These siphons will have
pipe additions or rectangular concrete boxes. The new flume is reinforced
concrete.
Project description
Upgrade 11 siphons, tow of them will be removed and open trapezoidal canal
will be constructed instead. Construct 1 flume. Construct 2 bridges.
Project status
The tender documents and final drawing are ready. Financing has not been
secured yet.
Estimated cost
The total estimated cost for the project is JD3.5 million.
|